| Daily Drill Report Hinkle Trust #1 & #2 Program |
|
|
|
|
| Hinkle Trust #1 Daily Drill Report |
|
|
|
|
|
|
|
| Project: |
Hinkle Trust #1 Permit # 060386 |
|
|
|
Effingham County, IL |
|
|
|
SEC 11 TWP 06N RGE 05E |
|
|
|
|
|
|
|
|
|
| January |
2010 |
|
|
|
|
|
|
|
|
| Day |
Date |
Operation |
|
|
|
|
|
|
|
|
|
|
|
|
|
| Pre-Drill |
Thrusday |
Begin moving Webster Drilling rig components to #1
location. |
|
|
|
14-Jan |
Build lease
road. Dig pits. |
|
|
|
|
|
|
|
|
|
|
|
| 1 |
15-Jan |
Rig up
and move water to location. |
|
|
|
Begin drilling surface hole for 8 5/8ths casing. |
|
|
|
|
Cemented 84 ft. 8 5/8ths
surface casing with 90 Sx. |
|
|
|
|
|
|
| 2 |
18-Jan |
7:00AM Activity:Drilling Formation:Shale and Lime |
|
|
|
|
T.D.: 90 ft. |
|
|
|
|
|
|
| 3 |
19-Jan |
7:00AM Activity:Drilling Formation:Shale and Lime |
|
|
|
|
T.D.:1080’ Footage Made: 1000’ Hrs. Dlg.: 13hrs |
|
|
|
|
Hrs. Trip:None Hrs. Circ.:1hr Hrs. Maint.: 6hrs; changing Kelly bushing |
|
|
|
Straight Hole Test: ¾
deg. @ 550’ |
|
|
|
|
Min./Ft.: 0 Hrs. J. & C.: 0 Hrs. Other: 4hrs; jetting pits |
|
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit: 13hrs Footage On Bit: 1000’ |
|
|
|
|
Wt. On Bit: 6000lbs RPM:
60 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
# Drill Collars: 15 Length: 453’ Drill Collar
Thread: x-hole
Drill Collar Size:
6’’ |
|
|
|
Bit #2 Mfg.: Reed
Type:BB Size: 7 7/8 PDC |
|
|
|
|
Straight Hole Test: ¾
deg. @ 550’ |
|
|
|
|
|
Straight Hole Test: ¾
deg. @ 1000’ |
|
|
|
|
|
|
|
| 4 |
20-Jan |
7:00AM Activity:Drilling Formation:Shale and Lime |
|
|
|
|
T.D.:
1933’ Footage
Made: 853’ Hrs. Dlg.: 16hrs |
|
|
|
|
Hrs. Trip: None Hrs. Circ.: 1hr; Straight Hole Test Hrs. Maint.: 1hr; Draw Works |
|
|
|
Min./Ft.: 0 Hrs. J. & C.: 0 Hrs. Other: 6hrs; connections and
jetting pits |
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit: 29hrs Footage On Bit: 1853’ |
|
|
|
|
Wt. On Bit: 6000lbs RPM:
60 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
# Drill Collars: 15 Length: 453’ Drill Collar
Thread: x-hole
Drill Collar Size:
6’’ |
|
|
|
Bit #2 Mfg.: Reed
Type:BB Size: 7 7/8 PDC |
|
|
|
|
Straight Hole Test: ¾
deg. @ 550’ |
|
|
|
|
Straight Hole Test: ¾
deg. @ 1000’ |
|
|
|
|
Straight Hole Test @ 1500’ is
¾ deg. |
|
|
|
|
|
|
| 5 |
21-Jan |
7:00AM Activity:Drilling Formation:Shale and Lime |
|
|
|
|
T.D.:
2442’ Footage
Made: 509’ Hrs. Dlg.: 15hrs |
|
|
|
|
Hrs. Trip: 1 hr; short trip Hrs. Circ.: 4hr Hrs. Maint.: none |
|
|
|
|
Dev. % Ft.: 1/2 @ 2000’ Other:4 hrs; cons. and running straight hole test |
|
|
|
Bit #2 Mfg.: Reed Type:BB Size: 7 7/8 PDC |
|
|
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit: 44hrs Footage On Bit: 2362’ |
|
|
|
|
Wt. On Bit: 6000lbs RPM:
60 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
# Drill Collars: 15 Length: 453’ Drill Collar
Thread: x-hole
Drill Collar Size:
6’’ |
|
|
|
Mud Wt.: 8.8 Vis.: 50 Filter Cake: 2/32 Chlorides: 700 |
|
|
|
|
GS: 2/4 CA: 0 LCM: 0 Solids %: 3.75
PH: 10 |
|
|
|
|
Water Loss: 0
PV: 20 YP: 12 Mud Pump: SPM 56 |
|
|
|
|
Mud Pump Pressure: 800 psig. Mud Pump Linear: 0 |
|
|
|
|
Straight Hole Test:@ 550’ is ¾
deg. |
|
|
|
|
Straight Hole Test:@ 1000’ is ¾
deg. |
|
|
|
|
Straight Hole Test @ 1500’ is
¾ deg. |
|
|
|
|
Straight Hole Test @ 2000’ is ½ deg. |
|
|
|
|
|
|
|
| 6 |
22-Jan |
7:00AM Activity: Drilling & Coring Formation: Shale and Sand |
|
|
|
|
T.D.:
2591’ Footage Made:
149’ Hrs.
Dlg.: 5 hrs w/ PDC bit and 4 hrs w/ core bit |
|
|
|
Hrs. Trip: 8hrs Hrs. Circ.: 2hr Hrs. Maint.: none |
|
|
|
|
Hrs. Other: 5 hrs; core work |
|
|
|
|
Bit #2 Mfg.: Reed Type:BB Size: 7 7/8 PDC |
|
|
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit: 49hrs Footage On Bit: 2511’ |
|
|
|
|
Wt. On Bit: 6000lbs RPM:
60 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
# Drill Collars: 15 Length: 453’ Drill Collar
Thread: x-hole
Drill Collar Size:
6’’ |
|
|
|
Remarks: Took core sample of cap rock w/ Rosiclare |
|
|
|
|
|
|
|
| 7 |
23-Jan |
7:00AM Activity: Waiting to get Mud Pump Fixed
Formation: |
|
|
|
|
T.D.:
2591’ Footage Made: Hrs. Dlg.: |
|
|
|
|
Bit #2 Mfg.: Reed Type:BB Size: 7 7/8 PDC |
|
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit: 49hrs Footage On Bit: 2511’ |
|
|
|
|
Wt. On Bit: 6000lbs RPM:
60 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
# Drill Collars: 15 Length: 453’ Drill Collar
Thread: x-hole
Drill Collar Size:
6’’ |
|
|
|
|
|
|
|
| 8 |
24-Jan |
7:00AM Activity:
Drilling Formation: Lime |
|
|
|
|
T.D.:
2775’ Footage
Made: 184’ Hrs. Dlg.: 16hrs |
|
|
|
|
Hrs. Trip: 2hrs; going back in the hole Hrs. Circ.:0 Hrs. Maint.: 1hr;
change pistons and pump |
|
|
Hrs. Other: 5hrs; waiting on part and putting pump together |
|
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit:65hrs Footage On Bit: 2695’ |
|
|
|
|
Wt. On Bit: 6000lbs RPM:
60 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
# Drill Collars: 15 Length: 453’ Drill Collar
Thread: x-hole
Drill Collar Size:
6’’ |
|
|
|
Bit #2 Mfg.: Reed
Type:BB Size: 7 7/8 PDC |
|
|
|
|
Straight Hole Test:@ 550’ is ¾
deg. |
|
|
|
|
Straight Hole Test:@ 1000’ is ¾
deg. |
|
|
|
|
Straight Hole Test @ 1500’ is
¾ deg. |
|
|
|
|
Straight Hole Test @
2000’ is ½ deg. |
|
|
|
|
Straight Hole Test @ 2500’
is ¼ deg. |
|
|
|
|
|
|
|
| 9 |
25-Jan |
7:00AM Activity:Drilling &
Logging Formation:Salem |
|
|
|
|
T.D.:
2950’ Footage
Made: 175’ Hrs. Dlg.: 4hrs |
|
|
|
|
Hrs. Trip: 4hrs Hrs. Circ.: 1 1/2hrs Hrs. Maint.: none |
|
|
|
|
Hrs Other:: 14 ½ hrs: Logging, Pipe and casing work |
|
|
|
|
Bit #2 Mfg.: Reed Type:BB Size: 7 7/8 PDC |
|
|
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit: 69hrs Footage On Bit: 2870’ |
|
|
|
|
Wt. On Bit: 6000lbs RPM:
60 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
# Drill Collars: 15 Length: 453’ Drill Collar
Thread: x-hole
Drill Collar Size:
6’’ |
|
|
|
Depth:
2852’ Mud
Wt.: 9.0 Vis.:55 Filter Cake: 1/32 Chlorides: 700 |
|
|
|
|
GS: 3-6 CA: 0 LCM: 0
Solids %: 5.25 PH: 10 |
|
|
|
|
Water Loss: 7.8
PV: 24 YP: 16 Mud Pump: SPM 56 |
|
|
|
|
Mud Pump Pressure: 800 psig. Mud Pump Linear: 0 |
|
|
|
|
Straight Hole Test:@ 550’ is ¾
deg. |
|
|
|
|
Straight Hole Test:@ 1000’ is ¾
deg. |
|
|
|
|
Straight Hole Test @ 1500’ is
¾ deg. |
|
|
|
|
Straight Hole Test @
2000’ is ½ deg. |
|
|
|
|
Straight Hole Test @ 2500’
is ¼ deg. |
|
|
|
|
|
|
| 10 |
26-Jan |
7:00AM Activity:Ran 4 ½” Casing to
2564’ Formation:McClosky |
|
|
|
|
T.D.:
2950’ |
|
|
|
|
|
Casing set at 2564
ft. with 375 sacks of cement. |
|
|
|
|
7 barrels were circulated
back to surface (12:15PM-'1:00PM Monday) into pits. |
|
|
|
Casing was ran to 2564’
to set packer |
|
|
|
|
All
operations on this well has ceased besides cutting the casing and nipple
up. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Hinkle
Trust #2 Daily Drill Report |
|
|
|
|
| Daily Drill Report |
|
|
|
|
|
|
|
| Project: |
Hinkle Trust #2 Permit # 060385 |
|
|
|
Effingham County, IL |
|
|
|
SEC 11 TWP 06N RGE 05E |
|
|
|
|
|
|
|
|
|
| January |
2010 |
|
|
|
|
|
|
|
|
| Day |
Date |
Operation |
|
|
|
|
|
|
|
|
|
|
|
|
|
| Pre-Drill |
Friday |
Moved all
drilling equipment and chemicals (mud) from |
|
|
|
29-Jan |
Hinkle Trust
#1 location to Hinkle Trust #2 location. |
|
|
|
|
Skidded rig with mast up and prepared location for
drilling. |
|
|
|
|
Scheduled to begin
drilling surface on Monday 02/01/10. |
|
|
|
|
|
|
| 1 |
1-Feb |
Time of Report: 7:00AM Activity: Rigging up to drill surface. |
|
|
|
|
|
|
| 2 |
2-Feb |
Time of Report: 8:00AM Activity: Drlg.
Formation: |
|
|
|
|
T.D.:
195’ Footage
Made: 195’ Hrs. Dlg.: 11hrs |
|
|
|
|
Hrs Other: 13hrs (note:1) |
|
|
|
|
Bit #1 Mfg.: Reed Type:BB Size: Surface: 12 1/4" (note:2) |
|
|
|
|
Jets -
8 # Size: 10 Hrs. On Bit: 11hrs Footage On Bit: 95' (note:2) |
|
|
|
|
|
Wt. On Bit: 6000lbs RPM:
60 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
|
Mud : Fresh
Water |
|
|
|
|
|
|
|
|
|
Note 1: Pumped water, drilled 84 ft. surface hole, ran 8 5/8” pipe, |
|
|
|
|
nipple up, and wait on
cement. |
|
|
|
|
|
Note 2: Drilled a 39’ deep rat hole with 8 3/4’’ bit. |
|
|
|
|
|
Cemented
84 ft. 8 5/8” casing with 75 SX cement, plug down at 1:00 AM. |
|
|
|
|
|
|
|
| 3 |
3-Feb |
Time of Report: 7:00AM Activity: Drlg.
Formation: Shale & Lime |
|
|
|
|
|
T.D.:
1125’ Footage
Made: 1030’ Hrs. Dlg.: 18hrs |
|
|
|
|
Hrs. Trip: None
Hrs. Circ.:2 hrs Hrs. Maint.: 1 hr;
worked on mud pump |
|
|
|
|
Hrs Other: 3 hrs; connections,
jetting pits, and S.H.T |
|
|
|
|
Bit #2 Mfg.: Reed Type:PDC Size: Surface: 7 7/8" |
|
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit: 29hrs Footage On Bit: 1125' |
|
|
|
|
Wt. On Bit: 6000lbs RPM:
60 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
Drill Collars:15 Length:453’ Drill Collar Thread: x-hole
Drill Collar Size:6’’ |
|
|
|
|
Mud : Fresh
Water |
|
|
|
|
|
S.H.T. @ 500’ is 1 deg. |
|
|
|
|
S.H.T. @ 1000’ is 1 deg. |
|
|
|
|
|
|
| 4 |
4-Feb |
Time of Report: 7:00AM Activity: Drlg.
Formation: Shale & Lime |
|
|
|
|
T.D.:
1972’ Footage
Made: 847’ Hrs. Dlg.: 16hrs |
|
|
|
|
Hrs. Trip: None
Hrs. Circ.:3 hrs; SHT and mud up Hrs. Maint.: none |
|
|
|
|
Hrs. Other: 5 hrs; jet pits, pump water, and mud up |
|
|
|
|
Bit #2 Mfg.: Reed Type:PDC Size: Surface: 7 7/8" |
|
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit: 34hrs Footage On Bit: 1877' (note:1) |
|
|
|
|
Wt. On Bit: 8000lbs RPM:
58 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
Drill Collars:15
Length:453’ Drill Collar Thread: x-hole
Drill Collar Size:6’’ |
|
|
|
|
Mud : Fresh
Water (Preparing to mud up) |
|
|
|
|
|
Note 1: Footage on bit is TD minus 95’ drilled with surface bit. |
|
|
|
|
|
S.H.T. @ 500’ is 1 deg. |
|
|
|
|
|
|
S.H.T. @ 1000’ is 1 deg. |
|
|
|
|
|
S.H.T. @ 1500’ is 1 deg. |
|
|
|
|
|
|
|
|
| 5 |
5-Feb |
Time of Report: 7:00AM Activity: Drlg.
Formation: Sand & Lime |
|
|
|
|
T.D.:
2550’ Footage
Made: 578’ Hrs. Dlg.: 19hrs |
|
|
|
|
Hrs. Trip: None
Hrs. Circ.:1 hr Hrs. Maint.: none |
|
|
|
|
|
Hrs. Other: 4 hrs; S.H.T., jet pits, and make connections |
|
|
|
|
Bit #2 Mfg.: Reed Type:PDC Size: Surface: 7 7/8" |
|
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit: 53hrs Footage On Bit: 2455' |
|
|
|
|
|
|
Wt. On Bit: 12000lbs RPM:
52 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
|
Drill Collars:15
Length:453’ Drill Collar Thread: x-hole
Drill Collar Size:6’’ |
|
|
|
|
Mud Depth: 2550’ Mud Wt.: 9.1 Vis.: 52 Filter Cake: 1/32 Chlorides:700 |
|
|
|
|
Water Loss:7.8
PV:8.0 YP:7.0 |
|
|
|
|
|
|
Mud Pump: SPM 54 Mud Pump Pressure: 800lbs psig. |
|
|
|
|
|
|
S.H.T. @ 500’ is 1 deg. |
|
|
|
|
|
S.H.T. @ 1000’ is 1 deg. |
|
|
|
|
|
|
S.H.T. @ 1500’ is 1 deg. |
|
|
|
|
S.H.T. @ 2000’ is 7/8 deg. |
|
|
|
|
|
|
|
|
| 6 |
6-Feb |
Time of Report: 7:00AM Activity: Shutting Down Operations |
|
|
|
|
T.D.: 2550' |
|
|
|
|
Past
24 hours, condition mud for logs, trip out of hole, Weatherford logs |
|
|
|
|
well,
talley and run 2550 ft. 4 ½” production casing. Schwartz on location |
|
|
|
|
to cement with 355
sx. Circulated 9 barrels into pit.
Plug down at 1:00 am. |
|
|
|
|
|
|
|