| MDM Energy, Inc., Daily Drill Report Hinkle
Trust #1 |
|
|
|
|
| Daily Drill Report |
|
|
|
|
|
|
|
| Project: |
Hinkle Trust #1 Permit # 060386 |
|
|
|
Effingham County, IL |
|
|
|
SEC 11 TWP 06N RGE 05E |
|
|
|
|
|
|
|
|
|
| January |
2010 |
|
|
|
|
|
|
|
|
| Day |
Date |
Operation |
|
|
|
|
|
|
|
|
|
|
|
|
|
| Pre-Drill |
Thrusday |
Begin moving Webster Drilling rig components to #1
location. |
|
|
|
14-Jan |
Build lease
road. Dig pits. |
|
|
|
|
|
|
|
|
|
|
|
| 1 |
15-Jan |
Rig up
and move water to location. |
|
|
|
Begin drilling surface hole for 8 5/8ths casing. |
|
|
|
|
Cemented 84 ft. 8 5/8ths
surface casing with 90 Sx. |
|
|
|
|
|
|
| 2 |
18-Jan |
7:00AM Activity:Drilling Formation:Shale and Lime |
|
|
|
|
T.D.: 90 ft. |
|
|
|
|
|
|
| 3 |
19-Jan |
7:00AM Activity:Drilling Formation:Shale and Lime |
|
|
|
|
T.D.:1080’ Footage Made: 1000’ Hrs. Dlg.: 13hrs |
|
|
|
|
Hrs. Trip:None Hrs. Circ.:1hr Hrs. Maint.: 6hrs; changing Kelly bushing |
|
|
|
Straight Hole Test: ¾
deg. @ 550’ |
|
|
|
|
Min./Ft.: 0 Hrs. J. & C.: 0 Hrs. Other: 4hrs; jetting pits |
|
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit: 13hrs Footage On Bit: 1000’ |
|
|
|
|
Wt. On Bit: 6000lbs RPM:
60 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
# Drill Collars: 15 Length: 453’ Drill Collar
Thread: x-hole
Drill Collar Size:
6’’ |
|
|
|
Bit #2 Mfg.: Reed
Type:BB Size: 7 7/8 PDC |
|
|
|
|
Straight Hole Test: ¾
deg. @ 550’ |
|
|
|
|
|
Straight Hole Test: ¾
deg. @ 1000’ |
|
|
|
|
|
|
|
| 4 |
20-Jan |
7:00AM Activity:Drilling Formation:Shale and Lime |
|
|
|
|
T.D.:
1933’ Footage
Made: 853’ Hrs. Dlg.: 16hrs |
|
|
|
|
Hrs. Trip: None Hrs. Circ.: 1hr; Straight Hole Test Hrs. Maint.: 1hr; Draw Works |
|
|
|
Min./Ft.: 0 Hrs. J. & C.: 0 Hrs. Other: 6hrs; connections and
jetting pits |
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit: 29hrs Footage On Bit: 1853’ |
|
|
|
|
Wt. On Bit: 6000lbs RPM:
60 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
# Drill Collars: 15 Length: 453’ Drill Collar
Thread: x-hole
Drill Collar Size:
6’’ |
|
|
|
Bit #2 Mfg.: Reed
Type:BB Size: 7 7/8 PDC |
|
|
|
|
Straight Hole Test: ¾
deg. @ 550’ |
|
|
|
|
Straight Hole Test: ¾
deg. @ 1000’ |
|
|
|
|
Straight Hole Test @ 1500’ is
¾ deg. |
|
|
|
|
|
|
| 5 |
21-Jan |
7:00AM Activity:Drilling Formation:Shale and Lime |
|
|
|
|
T.D.:
2442’ Footage
Made: 509’ Hrs. Dlg.: 15hrs |
|
|
|
|
Hrs. Trip: 1 hr; short trip Hrs. Circ.: 4hr Hrs. Maint.: none |
|
|
|
|
Dev. % Ft.: 1/2 @ 2000’ Other:4 hrs; cons. and running straight hole test |
|
|
|
Bit #2 Mfg.: Reed Type:BB Size: 7 7/8 PDC |
|
|
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit: 44hrs Footage On Bit: 2362’ |
|
|
|
|
Wt. On Bit: 6000lbs RPM:
60 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
# Drill Collars: 15 Length: 453’ Drill Collar
Thread: x-hole
Drill Collar Size:
6’’ |
|
|
|
Mud Wt.: 8.8 Vis.: 50 Filter Cake: 2/32 Chlorides: 700 |
|
|
|
|
GS: 2/4 CA: 0 LCM: 0 Solids %: 3.75
PH: 10 |
|
|
|
|
Water Loss: 0
PV: 20 YP: 12 Mud Pump: SPM 56 |
|
|
|
|
Mud Pump Pressure: 800 psig. Mud Pump Linear: 0 |
|
|
|
|
Straight Hole Test:@ 550’ is ¾
deg. |
|
|
|
|
Straight Hole Test:@ 1000’ is ¾
deg. |
|
|
|
|
Straight Hole Test @ 1500’ is
¾ deg. |
|
|
|
|
Straight Hole Test @ 2000’ is ½ deg. |
|
|
|
|
|
|
|
| 6 |
22-Jan |
7:00AM Activity: Drilling & Coring Formation: Shale and Sand |
|
|
|
|
T.D.:
2591’ Footage Made:
149’ Hrs.
Dlg.: 5 hrs w/ PDC bit and 4 hrs w/ core bit |
|
|
|
Hrs. Trip: 8hrs Hrs. Circ.: 2hr Hrs. Maint.: none |
|
|
|
|
Hrs. Other: 5 hrs; core work |
|
|
|
|
Bit #2 Mfg.: Reed Type:BB Size: 7 7/8 PDC |
|
|
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit: 49hrs Footage On Bit: 2511’ |
|
|
|
|
Wt. On Bit: 6000lbs RPM:
60 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
# Drill Collars: 15 Length: 453’ Drill Collar
Thread: x-hole
Drill Collar Size:
6’’ |
|
|
|
Remarks: Took core sample of cap rock w/ Rosiclare |
|
|
|
|
|
|
|
| 7 |
23-Jan |
7:00AM Activity: Waiting to get Mud Pump Fixed
Formation: |
|
|
|
|
T.D.:
2591’ Footage Made: Hrs. Dlg.: |
|
|
|
|
Bit #2 Mfg.: Reed Type:BB Size: 7 7/8 PDC |
|
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit: 49hrs Footage On Bit: 2511’ |
|
|
|
|
Wt. On Bit: 6000lbs RPM:
60 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
# Drill Collars: 15 Length: 453’ Drill Collar
Thread: x-hole
Drill Collar Size:
6’’ |
|
|
|
|
|
|
|
| 8 |
24-Jan |
7:00AM Activity:
Drilling Formation: Lime |
|
|
|
|
T.D.:
2775’ Footage
Made: 184’ Hrs. Dlg.: 16hrs |
|
|
|
|
Hrs. Trip: 2hrs; going back in the hole Hrs. Circ.:0 Hrs. Maint.: 1hr;
change pistons and pump |
|
|
Hrs. Other: 5hrs; waiting on part and putting pump together |
|
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit:65hrs Footage On Bit: 2695’ |
|
|
|
|
Wt. On Bit: 6000lbs RPM:
60 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
# Drill Collars: 15 Length: 453’ Drill Collar
Thread: x-hole
Drill Collar Size:
6’’ |
|
|
|
Bit #2 Mfg.: Reed
Type:BB Size: 7 7/8 PDC |
|
|
|
|
Straight Hole Test:@ 550’ is ¾
deg. |
|
|
|
|
Straight Hole Test:@ 1000’ is ¾
deg. |
|
|
|
|
Straight Hole Test @ 1500’ is
¾ deg. |
|
|
|
|
Straight Hole Test @
2000’ is ½ deg. |
|
|
|
|
Straight Hole Test @ 2500’
is ¼ deg. |
|
|
|
|
|
|
|
| 9 |
25-Jan |
7:00AM Activity:Drilling &
Logging Formation:Salem |
|
|
|
|
T.D.:
2950’ Footage
Made: 175’ Hrs. Dlg.: 4hrs |
|
|
|
|
Hrs. Trip: 4hrs Hrs. Circ.: 1 1/2hrs Hrs. Maint.: none |
|
|
|
|
Hrs Other:: 14 ½ hrs: Logging, Pipe and casing work |
|
|
|
|
Bit #2 Mfg.: Reed Type:BB Size: 7 7/8 PDC |
|
|
|
|
|
Jets -
6 # Size: 11 Hrs. On Bit: 69hrs Footage On Bit: 2870’ |
|
|
|
|
Wt. On Bit: 6000lbs RPM:
60 Pipe
Thread: x-hole Pipe Size: 4 ½’’ |
|
|
|
|
# Drill Collars: 15 Length: 453’ Drill Collar
Thread: x-hole
Drill Collar Size:
6’’ |
|
|
|
Depth:
2852’ Mud
Wt.: 9.0 Vis.:55 Filter Cake: 1/32 Chlorides: 700 |
|
|
|
|
GS: 3-6 CA: 0 LCM: 0
Solids %: 5.25 PH: 10 |
|
|
|
|
Water Loss: 7.8
PV: 24 YP: 16 Mud Pump: SPM 56 |
|
|
|
|
Mud Pump Pressure: 800 psig. Mud Pump Linear: 0 |
|
|
|
|
Straight Hole Test:@ 550’ is ¾
deg. |
|
|
|
|
Straight Hole Test:@ 1000’ is ¾
deg. |
|
|
|
|
Straight Hole Test @ 1500’ is
¾ deg. |
|
|
|
|
Straight Hole Test @
2000’ is ½ deg. |
|
|
|
|
Straight Hole Test @ 2500’
is ¼ deg. |
|
|
|
|
|
|
| 10 |
26-Jan |
7:00AM Activity:Ran 4 ½” Casing to
2564’ Formation:McClosky |
|
|
|
|
T.D.:
2950’ |
|
|
|
|
|
Casing set at 2564
ft. with 375 sacks of cement. |
|
|
|
|
7 barrels were circulated
back to surface (12:15PM-'1:00PM Monday) into pits. |
|
|
|
Casing was ran to 2564’
to set packer |
|
|
|
|
All
operations on this well has ceased besides cutting the casing and nipple
up. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|